Gahanna Creekside

The revitalization of Olde Gahanna took a major leap forward with the beginning of the New Creekside Project redevelopment and park extension along Mill Street and Creekside Park. Fine dining, unique shopping, conveniently located offices, and stunning residences, along the expanded public parking and new community gathering space, will make Olde Gahanna truly the place to live, work, and play.

Work consisted of:

  • 4,436 Linear feet of curb removal
  • 17,136 Square feet of walk/drive removals
  • 9 Each bollards removed
  • 4 Each manholes adjusted to grade
  • 10 Each catch basins adjusted to grade
  • 32 Each water/gas adjusted to grade
  • 4,436 Linear feet of type 6 curb
  • 1,000 Square feet of service walks
  • 14,451 Square feet of paver base
  • 27 Each ramps
  • 20 Each light pole bases
  • 20 Each set tree grates
  • 1 Each fire hydrant
  • 30 Tons of asphalt
  • 64 Linear feet of type 6 curb demo
  • 1 Each Steps
  • 1,200 Square feet of pavement removal
  • 1,684 Square feet of 8” drive aprons
  • 112 Linear feet of 2’ Border curb
  • 1 Each Footer